![space](spacer.gif)
Old Lock 2E
Original lock chamber incorporated into new channel.
![space](spacer.gif)
Channel between Old Lock 2E and Queen Street
Deep channel created between old lock and Queen Street South bridge.
![space](spacer.gif)
Queen Street South Bridge
Bridge underpinned to enable deep channel to be constructed below it.
![space](spacer.gif)
Tunnel under Bates and Co
Tunnel constructed below two factory buildings.
![space](spacer.gif)
New Lock 2E
Lock repositioned west of new tunnel.
![space](spacer.gif)
Tunnel under Sellers Engineering
Culverted section of canal replaced by tunnel under factory site.
![space](spacer.gif)
New Lock 3E
Lock repositioned west of new tunnel.
![space](spacer.gif)